Written estimate before the move
One coordinator, one number
Verified partner network
24-hour services available

Industrial and Commercial Shifting

Machinery, bulk material and commercial goods moved after a site survey and a written plan.

Service

About Industrial and Commercial Shifting

Industrial and commercial shifting covers factories, warehouses, showrooms and offices with heavy or bulky items. Every job starts with a site survey, because weight, floor capacity and access decide how the work is planned.

What is included

  • Site survey before the estimate is written
  • Planning around your site timings and access windows
  • Loading equipment arranged to suit the item and the site
  • Packing of machinery and equipment as per the requirement
  • Inventory and handover at the destination
  • A coordinator who runs the schedule with your team
Packers wrapping a bed headboard with corrugated sheet and stretch film
Process

How the move runs

  • The site survey records items, weights and access constraints
  • A method statement and schedule are written into the estimate
  • The crew works to the agreed window, section by section
  • Delivery and handover are checked against the inventory
Pricing

What decides the price of industrial and commercial shifting

Industrial jobs are priced after the site survey, on the items involved, the access and the schedule the work runs in.

Each factor that applies to your job is listed in the written estimate issued after the requirement review. Figures given before that review are indicative.

  • Items, weights and floor capacity recorded in the survey
  • Access windows and site timings
  • Loading equipment needed for the job
  • Phased or single-schedule execution
  • Distance between the two sites
  • Storage where the dates do not match
FAQ

Questions about Industrial and Commercial Shifting

Do you survey the site first?

Yes. Industrial and commercial jobs start with a site survey. The estimate follows the survey, not the other way round.

Can the work be phased so production is not stopped?

Phased execution around your site timings can be planned. The schedule is agreed during the requirement review and written into the estimate.

Do you move heavy machinery?

Machinery within the access and equipment planned for the site is moved as part of the job. Anything unusual is flagged during the survey.

How is pricing worked out?

Volume or item count, distance, access, equipment needed and the schedule. All of them appear as cost factors in the written estimate.

Plan your industrial and commercial shifting

Send the details for a free quote and a written estimate after the requirement review.

Call +91 82640 91244WhatsApp